EU PROD TP 7.3.6g HOTFIX rollout from 2025-02-20 13:00 UTC to 2025-02-20 13:30 UTC
Scheduled maintenance
EU PROD
Network Server for ThingPark Wireless
Network Server for ThingPark Enterprise
2025-02-20 13:00 UTC
· 30 minutes
Updates
Update
February 20, 2025 · 13:43 UTC
Upgrade is completed.
Note: background sync between main and backup NS was longer than expected, the traffic was flowing normally through the second nodes.
Scheduled
February 19, 2025 · 14:16 UTC
Actility Network Operations is going to install ThingPark Wireless and Enterprise 7.3.6g HOTFIX on EU PROD platform.
Please find details in the release notes:
- 📝Maintenance Release Notes (for ThingPark Wireless customers)
This is a hotfix release regarding stability of Network Server.
← Back